Every phone number, address, hour, and portal you need for a Prince William County permit is on this page, pulled from the county's own pages and checked this month. Below that, the county's actual list of what needs a permit and what does not, and the electrical rules I work under in this county every week.

Call 703.225.8222 Ask about a permitted job
  • Licensed Master Electrician
  • Virginia license 2705181607
  • Permits pulled in ePortal weekly

Prince William County permit office, at a glance

Verified against the county's Building Development Division pages in September 2026. Hours and numbers change, so the county page is linked at the end of the row when it matters.

OfficeBuilding Development Division, Department of Development Services (county page)
Address5 County Complex Court, Suite 120, Prince William, VA 22192
Main phone703-792-6930
EmailBDD@pwcgov.org
Counter hoursMonday to Friday, 8 a.m. to 4 p.m., excluding holidays. All counters closed 8 to 9 a.m. on the 2nd and 4th Wednesdays. Tickets issued until 4 p.m. (contact and hours)
Zoning counters703-792-6830, ZoningCounters@pwcgov.org, 8 a.m. to 4 p.m.
Online portalePortal: apply for trade permits, upload plans, schedule inspections, pay invoices, search any permit (what ePortal does)
ePortal account help703-792-6875, dms@pwcgov.org
Automated inspection line1-866-457-5280, 7 days a week: permit status, plan status, schedule or cancel inspections, results (how to schedule)
Inspection hoursMonday to Friday, 8 a.m. to 3 p.m. Requests must be in by 3 p.m. the working day before
Heavy-up inspection dayCall the Building Construction Inspection Branch, 703-792-7006, between 7:30 and 8 a.m. on the day of the utility outage
FeesSet by the Building Development Fee Schedule. Cash, check to Prince William County, or Visa, MasterCard, Discover

Quick answer

Do you need a permit in Prince William County?

If the project adds to the house, changes its structure, or alters the electrical, plumbing, or heating and cooling systems, yes. That includes a finished basement, an addition, a deck 16.5 inches or more above grade, a new electrical circuit, fixture, or receptacle, a panel replacement, an EV charger, a generator, a hot tub, and replacing a gas furnace or water heater. If it is a like-for-like replacement or cosmetic, no: painting, flooring, cabinets, same size windows, a new light fixture in the old fixture's spot, an appliance swapped for one of similar capacity in the same place, or an electric heat pump replaced with the same type in the same location. The county publishes both lists, and I reproduce them below.

The county's own list: what needs a permit and what does not

Hi, I'm Peter, the Master Electrician at PRO Electric plus HVAC. I pull permits in this county most weeks, and the single most useful thing the county publishes is its Do I Need a Permit page, because it is a plain list rather than a code citation. Here it is, reorganized with the electrical and HVAC items first, since that is where most of the questions come from. This applies to one- and two-family homes and townhouses; the county treats condo and apartment buildings as commercial.

WorkPermitNotes
New electrical circuit, fixture, or receptacleRequiredThe county lists this by name. A new outlet in a new spot is a permit
Panel replacement or service heavy-upRequiredElectrical permit, plus the same day utility outage inspection described below
EV chargerRequiredElectrical permit. The county has a residential EV charging page
Generator, transfer switch, battery backupRequiredElectrical permit; gas piping may add a gas permit
New appliance in a new location, or an upgraded appliance needing a bigger circuitRequiredThe county lists this by name
Replacing a gas or oil furnace, gas logs, water heater, or rangeRequiredListed as always required, regardless of location
Hot tub or spaRequiredElectrical permit, and zoning approval
SolarRequiredBuilding and electrical; see the county's residential solar page
Any alteration to the electrical, plumbing, or mechanical systemRequiredThe county's catch-all line
Finished basement, addition, garage, carportRequiredBuilding permit with trade permits under it
Deck or porch 16.5 inches or more above gradeRequiredPlus zoning approval
Shed over 256 square feetRequiredAny shed with electrical needs an electrical permit even under 256; zoning approval for every shed
Replacing an existing light fixtureNot requiredSame location, existing box
Replacing an appliance in the same location, similar capacity, no circuit changeNot requiredMove it or upsize it and it becomes required
Replacing an electric water heater, same size, same locationNot requiredGas water heaters are on the required list
Replacing an electric furnace, heat pump, or AC condenser with the same type in the same locationNot requiredSame type, same spot. A new location or fuel type is required
Repairing an AC or furnace with replacement partsNot requiredOrdinary repair
Low voltage wiring under 50 voltsNot requiredDoorbells, alarms
Painting, flooring, cabinets, trim, gutters, re-glazingNot requiredCosmetic
Windows and doors of the same size in the same openingNot requiredStructural changes to the opening make it required
Fences, sheds 256 square feet or less, patio slabsNot requiredZoning approval still required

Two things the county says right under that list that people skip. Work that does not need a permit still has to meet code. And zoning approval is a separate step for exterior projects, required whether or not a building permit is, so a fence, a shed, or a patio slab still goes past the Zoning Counters. Your HOA is a third layer the county does not enforce.

The electrical permit, specifically

An electrical permit in Prince William County is a trade permit. It can stand alone, for a panel job or a new circuit, or sit under a master building permit when it is part of a basement or an addition. Either way it is applied for in ePortal, and for most residential electrical work no plans are required beyond a description of the job.

Who applies

  • You, doing the work yourself on your own home. You are the permit holder and you sign the county's Statement of Exemption, which acknowledges you are doing the work without a contractor license. The inspections are the same ones a contractor gets.
  • A contractor doing the work. The contractor applies, and the county requires a copy of the Virginia contractor license and a Prince William County business license with the application. Do not sign the Statement of Exemption for a contractor's job; the county says so on its Who Should Apply page, and signing it puts the liability on you.
  • Check the license. Virginia licenses are verified at DPOR, and the county business license at 703-792-6710. A contractor who cannot produce both cannot pull the permit, and the job is then either unpermitted or permitted under your name.

The inspections

  • Rough-in before walls close, for any new wiring inside walls or ceilings.
  • Final when the work is complete and energized.
  • A trade final under a building permit can be scheduled the same day as the building final, and the same inspector can do both.
  • The county also runs an inspection certification program for certain electrical and plumbing items, listed in its FAQ, where the contractor certifies specific work instead of a field inspection.

How a heavy-up inspection actually works here

This is the one that catches contractors from outside the county. A panel or service replacement means the utility pulls the meter, and the county wants to inspect before the power goes back on. So the inspection is scheduled in ePortal or through the automated line for the same day as the utility's disconnect, using codes 202 and 250, and on the morning of the job the owner or contractor calls the Building Construction Inspection Branch at 703-792-7006 between 7:30 and 8 a.m. to give the inspector an approximate ready time. Skip the call and you can end the day with new equipment, no inspection, and no power. We coordinate all three, the utility, the county, and the crew, so the house is dark for hours rather than overnight.

The process, in the order the county runs it

  1. Check the three layers. HOA covenants, zoning approval for anything exterior, and the building or trade permit. The county's Do I Need a Permit page settles the third; the Zoning Counters settle the second; your HOA settles the first.
  2. Create an ePortal account. Register, then call 703-792-6875 or email dms@pwcgov.org if you have existing cases to attach. Trade permits are applied for directly in the portal.
  3. Apply and upload. Trade permits need the application and, for a contractor, the license copies. Building permits need a site plan and construction drawings, submitted electronically through the ePortal plans module. The county's Residential Buildings, Structures, and Additions page lists what an addition needs.
  4. Plan review, if any. Trade permits for routine residential work generally issue without plan review. Building permits go through review, and comments come back in ePortal, where you resubmit.
  5. Pay and post. Fees are set by the Building Development Fee Schedule and paid at issuance. The permit goes in a front window of the house and the approved plans stay on site; the inspector needs both before proceeding.
  6. Schedule inspections. ePortal or 1-866-457-5280, by 3 p.m. the working day before, in the 8 a.m. to 3 p.m. window. Results post in ePortal. A failed item gets corrected and re-inspected.
  7. Close it out. A passed final closes the permit. New homes and additions that create living space get a certificate of occupancy. Keep the permit number; it is what a buyer's inspector will ask for in 10 years.

Which code the inspector is holding

Virginia is a statewide code state. The county does not write its own electrical rules; it enforces the Virginia Uniform Statewide Building Code, and the current edition is the 2021 USBC, which incorporates the 2021 International Codes and the 2020 National Electrical Code. It took effect on January 18, 2024, with a one year transition, and the county's own VUSBC page states that every permit application filed on or after January 18, 2025 must comply with the 2021 edition (Prince William County, n.d.; Virginia DHCD, n.d.).

Three changes in that edition show up on residential electrical permits, and they are the ones that surprise homeowners on a panel quote:

  • Outdoor emergency disconnect, Virginia Residential Code Section E3601.8. Required in a readily accessible outdoor location on new services and on service replacements. I wrote a full page on what it is and when it is required.
  • Surge protective device at the service, Section E3606.5. Required on new and replaced service equipment. That is why a whole home surge protector is on every heavy-up quote we write.
  • GFCI protection expanded to cover receptacles up to 250 volts in the listed locations, which pulls in dryer and range receptacles in some layouts (Fairfax County Land Development Services, 2024, summarizing the statewide changes).

Our code correction work in the county is mostly bringing older panels and services up to those three items when something else triggers the permit.

Manassas, Manassas Park, and the towns are different offices

The City of Manassas and the City of Manassas Park are independent cities. They are surrounded by Prince William County and share its mailing addresses, and they are not part of it for permitting. Each runs its own building and inspection office with its own portal and fee schedule. A panel upgrade at a Manassas address might be a county permit or a city permit depending on which side of the city line the parcel sits, and we check the parcel before we file, because a permit filed with the wrong office is a week lost.

The four incorporated towns, Dumfries, Haymarket, Occoquan, and Quantico, handle their own zoning. Whether the building permit itself goes to the town or to the county varies, so ask the town office first when the address is inside town limits.

Prince William County is also split between two utilities, Dominion Energy in the eastern county and NOVEC across much of the western county, which matters on a heavy-up because the utility outage has to be scheduled with whichever one owns your meter.

Fees, certificates of occupancy, and unpermitted work

Fees come from the county's Building Development Fee Schedule and scale with the type of permit and the scope: a single trade permit is a small fee, a full addition with plan review is not. The county takes cash, checks payable to Prince William County, and Visa, MasterCard, or Discover. When we pull the permit, the county's fee appears on your invoice at cost.

A certificate of occupancy is the county's sign-off that a new building, an addition that creates living space, or a changed use has passed final inspection and can be occupied. A trade permit for a circuit or a panel does not produce one; it produces a closed permit with a passed final, which is the record that matters at resale. The county's use groups and certificate of occupancy page covers the rest.

Unpermitted work surfaces at resale more than anywhere else, when a buyer's inspector finds a finished basement, a panel, or a circuit with no permit history. The county has a defined path for correcting and resolving unpermitted work: apply after the fact, get it inspected, and open up anything the inspector cannot see. It is always cheaper to permit the work when it is done. We are asked to inspect and certify other people's unpermitted electrical work every month, and the answer usually involves opening drywall.

How we handle the permit on your job

  • We hold the Virginia contractor license and the Prince William County business license the county requires from a contractor applicant, so the permit is in our name, not yours.
  • We file in ePortal, schedule every inspection by the 3 p.m. cutoff, and meet the inspector on site.
  • On a heavy-up we coordinate Dominion or NOVEC, the county's same day inspection, and the crew, so the house is without power for hours rather than overnight.
  • We check the parcel first, so a Manassas address goes to the right office.
  • You get the permit number, the passed inspection record, and the closed permit for your files.

That applies to panel upgrades, EV charger installation, outdoor service disconnects, home wiring, hot tub wiring, standby power, and HVAC replacement, which needs a mechanical permit when the fuel type or location changes. Veteran and military discounts apply.

Call 703.225.8222 Request a quote

Prince William County permit questions, answered

Where is the Prince William County permit office, and what is the phone number?

The Building Development Division of the Department of Development Services is at 5 County Complex Court, Suite 120, Prince William, VA 22192, off Prince William Parkway in Woodbridge. The main number is 703-792-6930. Counters are open Monday through Friday, 8 a.m. to 4 p.m., excluding holidays, and every counter closes from 8 to 9 a.m. on the 2nd and 4th Wednesday of the month. Tickets for counter service stop at 4 p.m.

What is the Prince William County ePortal and how do I use it?

ePortal is the county's online system for permits, plans, inspections, and payments. Anyone can search permits and inspection results without an account. To apply for a trade permit, upload plans, schedule an inspection, or pay an invoice, you create an account, and if you already have open cases you call 703-792-6875 or email dms@pwcgov.org so the county can attach them to your login. Electrical, plumbing, mechanical, and gas permits are applied for directly in ePortal.

Do I need a permit for electrical work in Prince William County?

Yes for anything that changes the system: a new circuit, a new fixture or receptacle in a new location, a panel replacement or heavy-up, an EV charger, a generator or transfer switch, a hot tub, a new appliance on a new circuit, or an upgraded appliance that needs a bigger circuit. No for like-for-like swaps: replacing an existing light fixture, replacing an appliance in the same spot with similar capacity and no change to the circuit, replacing an electric water heater with the same size in the same place, and low voltage wiring under 50 volts such as a doorbell or alarm. The county publishes both lists on its Do I Need a Permit page.

Can a homeowner pull an electrical permit in Prince William County?

Yes, for work you are doing yourself on your own home. You become the permit holder and sign the county's Statement of Exemption, which is the form acknowledging you are doing the work without a contractor license. The inspections are the same as for a contractor. If a contractor is doing the work, the contractor pulls the permit and has to supply a copy of a Virginia contractor license and a Prince William County business license, and you should not sign the exemption.

How do I schedule an inspection in Prince William County?

Through ePortal, or by calling the automated line at 1-866-457-5280 with your permit number and the inspection code from your permit. Inspections have to be requested by 3 p.m. on the working day before you want them, and they are performed Monday through Friday between 8 a.m. and 3 p.m. The permit has to be posted in a front window and the approved plans available on site, or the inspector will not proceed.

How does a panel heavy-up inspection work in Prince William County?

The county coordinates it with the utility outage. You schedule an electrical inspection in ePortal or through the automated line for the same day the power company has scheduled the disconnect, using inspection codes 202 and 250, and on the morning of the job the owner or contractor calls the Building Construction Inspection Branch at 703-792-7006 between 7:30 and 8 a.m. to tell the inspector roughly when the heavy-up will be ready. Miss that call and the inspector may not come, which leaves the house without power overnight.

Which building code does Prince William County use?

The 2021 Virginia Uniform Statewide Building Code, which incorporates the 2021 International Codes and the 2020 National Electrical Code. The 2021 edition took effect on January 18, 2024, and the county's own page states that every permit application filed on or after January 18, 2025 has to comply with it. There is no county electrical code; Virginia is a statewide code state and the county enforces the state code.

What changed for electrical work under the 2021 code?

For a homeowner, the two you feel on a panel job are the outdoor emergency disconnect, which the Virginia Residential Code now requires in a readily accessible outdoor location on new services and service replacements, and a surge protective device at the service panel, also required on new and replaced service equipment. GFCI protection also expanded to cover 250 volt receptacles in the listed locations. If your quote for a heavy-up includes a disconnect and a surge device, that is the code, not an add-on.

What about Manassas and Manassas Park?

They are independent cities, not part of Prince William County for permitting. Each has its own building and inspection office, its own portal, and its own fee schedule. A Manassas mailing address can still be in the county, so we check the parcel before we file. The towns of Dumfries, Haymarket, Occoquan, and Quantico handle their own zoning; ask the town whether your building permit goes to the town or to the county.

How much does a permit cost in Prince William County?

The county sets fees in its Building Development Fee Schedule, and the amount depends on the type of permit and the scope of work, so a single trade permit for a circuit costs far less than a full addition with plan review. Fees are paid at issuance by cash, check payable to Prince William County, or Visa, MasterCard, or Discover. When we pull a permit for your job, the fee is on your invoice at the county's rate with no markup.

What is a certificate of occupancy and when do I need one?

A certificate of occupancy is the county's confirmation that a building or a changed part of one has passed its final inspections and can be used for its intended purpose. New homes, additions that create living space, and changes of use get one after the final inspection. A trade permit for a circuit or a panel does not produce a certificate of occupancy; it produces a passed final inspection and a closed permit, which is what a buyer's home inspector looks for.

What happens if work was done without a permit?

The county has a process for correcting and resolving unpermitted work: a permit is applied for after the fact, the work is inspected, and anything that cannot be inspected without opening walls may have to be opened. It comes up most often at resale, when a buyer's inspector finds a finished basement, a panel, or a circuit with no permit history. It is cheaper to permit the work when it is done than to expose it later.

Do I need zoning approval too?

For most exterior work, yes, even when no building permit is required. Zoning approval is always required for decks, additions, garages, carports, retaining walls, fences, hot tubs, and pools, and for a basement wet bar or second kitchen. The Zoning Counters are at 703-792-6830 or ZoningCounters@pwcgov.org, in the same building. Check your HOA covenants separately; the county does not enforce those.

Does PRO Electric plus HVAC pull the permit for me?

Yes, on every job that needs one. We hold the Virginia contractor license and the Prince William County business license the county requires from a contractor applicant, we file in ePortal, we schedule the inspections, and we meet the inspector. For a heavy-up we coordinate the utility outage and the same day inspection so the house is not left dark. You get the permit number and the passed inspection record for your files.

Where we work in Prince William County

Electrical and HVAC service across the county, from the same licensed team:

For a permitted job that also needs a plumber, our preferred partner is Veteran Plumbing Services. And if your project is across the county line, the same guide exists for Fairfax County building permits.

Fairfax, Arlington, Loudoun, and Prince William Counties

Planning permitted electrical work?

Tell us the address and the project. We will tell you which office the permit goes to, what the 2021 code adds to the job, and what it costs before anything is filed. Or call 703.225.8222.

Sources

County contact details, hours, lists, and procedures were taken from the pages below and checked in September 2026. Code citations were checked against the edition Virginia has adopted.

  1. Prince William County Building Development Division. (n.d.). Contact and hours. https://www.pwcva.gov/department/building-development-division/contact-hours
  2. Prince William County Building Development Division. (n.d.). Do I need a permit?. https://www.pwcva.gov/department/building-development-division/do-i-need-permit
  3. Prince William County Building Development Division. (n.d.). Who should apply for a permit?. https://www.pwcva.gov/department/building-development-division/who-should-apply-permit
  4. Prince William County Building Development Division. (n.d.). FAQs. https://www.pwcva.gov/department/building-development-division/faqs
  5. Prince William County Building Development Division. (n.d.). Virginia Uniform Statewide Building Code. https://www.pwcva.gov/department/building-development-division/vusbc
  6. Prince William County Building Development Division. (2021). Automated plan status and inspection scheduling system. https://www.pwcva.gov/assets/2021-04/005543.pdf
  7. Prince William County Department of Development Services. (n.d.). ePortal access. https://www.pwcva.gov/department/development-services/eportal-access
  8. Virginia Department of Housing and Community Development. (n.d.). Codes. https://www.dhcd.virginia.gov/codes
  9. Fairfax County Land Development Services. (2024). Summary of code changes, 2021 Virginia USBC. https://www.fairfaxcounty.gov/landdevelopment/sites/landdevelopment/files/Assets/documents/24-02-summary-code-changes-2021-virginia-usbc.pdf

Permitted, inspected, and closed. That is the whole job.

Licensed Master Electricians and HVAC technicians serving Prince William, Fairfax, Loudoun, and Arlington Counties. We pull the permit, meet the inspector, and hand you the record. Veteran and military discounts available.

Call 703.225.8222 Contact us

PRO Electric plus HVAC. Virginia Electrical and HVAC Contractor License 2705181607. 800 West Broad Street, Falls Church, VA 22040.