A little at a time.
A portable Level 1 setup can work for light daily driving when the vehicle has enough time parked. The outlet and circuit still need to be suitable.
PRO Electric plus HVAC · Home charging
Pull in. Plug in. Get on with your evening. We plan and install home EV charging around your vehicle, your parking space, and the power your home can support.
Master Electrician oversight · Fairfax, Loudoun, Arlington & Prince William
The clear answer
We assess your electrical system, plan a suitable circuit and charging location, install compatible equipment, test operation, and coordinate the required permit and inspection. We serve homeowners across Northern Virginia with Master Electrician oversight and a clear estimate before installation.
Choose around the way you drive
How far you drive and how long you park matter as much as the number on the charger.
A portable Level 1 setup can work for light daily driving when the vehicle has enough time parked. The outlet and circuit still need to be suitable.
A dedicated home charging circuit can replenish energy faster. We match the output to your vehicle, routine, and the electrical system.
Connector choice depends on your exact vehicle and charger. Tesla and other EV brands may use different ports across models and years.
Interactive daily-charging planner
Compare the time to replace a day’s driving. Change the example to fit your routine, then bring the numbers to your installation conversation.
Compared with your 8-hour charging window
In this example, Level 2 at 32A replaces your daily driving within 8 hours. Your electrician still needs to confirm the circuit and equipment.
Example assumptions: 120V × 12A for Level 1; 240V × the selected charging current for Level 2; 90% wall-to-battery efficiency. Power is capped at your selected vehicle AC limit. Temperature, battery state, charging behavior, and actual efficiency can change the time. Charger current is not a breaker-size recommendation.
Three decisions before equipment is ordered
We connect the choices that make home charging convenient and practical.
Explore the relationship between home & EV loads
Switch example appliances on and off, add an EV charger, and compare service sizes. This is an illustration of simultaneous power use, not a capacity test for your home.
EV charging adds a sustained load. Change the example to see how much the total moves, and why the installation starts with a proper assessment.
These numbers do not approve a charger or establish the capacity of your home.
The simulator uses example appliance wattages. It adds the selected watts and compares the total with service amperage × 240V. It does not apply NEC demand factors, continuous-load requirements, actual equipment ratings, phase balance, measured demand, or automatic load management. It does not predict breaker trips. The example service choices are not upgrade recommendations.
Already own the charger? Share its exact model, the vehicle model, and where you want to park. Leave electrical covers in place when taking any photos.
Talk with our electrical teamCapacity questions deserve options
We evaluate the installation before recommending the scope. Depending on your home and equipment, the discussion may include:
A lower charging rate may still cover your daily driving. The setting must match the designed circuit and equipment requirements.
Approved equipment can adjust EV charging as other loads change. We assess compatibility, local requirements, and the installation involved.
Condition, space, and capacity may point to an upgrade. We explain why it is needed and how it changes the project.
Explore panel optionsFrom first call to first charge
One plan for the equipment, electrical work, permit, and practical details of using your charger.
We check the service, panel, parking location, vehicle, and charger requirements. You get a clear scope and estimate.
We confirm the wiring route, equipment, protection, and permit requirements before installation begins.
Our electrical team installs the agreed equipment, sets the appropriate output, and tests charging operation.
We explain basic operation, coordinate the required inspection, and provide the applicable work and permit records.
Have these ready: vehicle make/model/year, the charger model if selected, your property address, parking location, and any installation deadline or association approval.
Understand the estimate
Two chargers can look the same on the wall and take very different work to install. Your estimate should explain the actual scope.
Ask about financing for larger projects and the veteran and military discount program.
Read our Northern Virginia installation guide. Use the official links above for current incentive terms.
Google reviews
Customer experiences with PRO Electric plus HVAC, in their own words.
Include your property address, vehicle model/year, and preferred charger location. Have your daily-charging planner notes ready when discussing the project.
EV charging questions, answered
Practical answers about installation, charging time, connectors, panels, and permits.
Ask about your setupYes. We plan and install compatible home Level 2 charging equipment, including Tesla Wall Connector options. Tell us the vehicle’s make, model, and year, plus any charger you already own. We check the connector, charging limits, equipment requirements, and installation location before defining the work.
The price depends on the charging equipment, panel capacity, distance to the parking space, wiring route, wall or trench work, and required permits. A short route beside a garage panel differs from a detached garage or driveway installation. We assess the project and explain the scope and estimate before installation.
Not automatically. We evaluate the service, panel condition, available space, and electrical load. Depending on the equipment and applicable requirements, a lower charging output or an approved load-management system may be an option. A panel or service upgrade is recommended when the assessment supports it. The on-page simulator cannot approve your installation.
It depends on the energy you need to add, the charging equipment, and your vehicle’s AC charging limit. Level 1 uses 120 volts; residential Level 2 usually uses 240 volts and can replenish energy faster. Replacing a day’s driving takes less time than charging a depleted battery. Use the daily-charging planner as an estimate, then confirm the setup for your vehicle.
J1772 and NACS, also standardized as SAE J3400, are different charging connector types. Vehicle compatibility depends on the model, model year, and approved equipment or adapters. Tesla’s Universal Wall Connector includes NACS and J1772 capability. We check the exact vehicle and charger combination rather than choosing by brand alone.
That depends on the charger’s listing, manufacturer instructions, location, and circuit design. Hardwired equipment is connected directly to its circuit. Plug-in equipment requires an appropriate dedicated circuit and compatible receptacle with the required protection. An existing dryer or garage outlet should be evaluated before being used for EV charging.
Yes. We handle the electrical permit required for the agreed installation and coordinate the applicable inspection. The property’s jurisdiction determines the permit office. We install to the applicable Virginia requirements and manufacturer instructions; inspection approval comes from the local authority.
Often, but the site needs review. Outdoor work requires suitable equipment, a protected wiring route, and practical cable placement. Townhomes and condos may also need owner, landlord, association, or property-management approval and a plan for parking rights and power routing. Share these details before equipment is selected.
Check current utility terms before counting on an incentive. Under current IRS guidance, the federal Section 30C credit does not apply to charging equipment placed in service after June 30, 2026. Utility rewards, rates, and charging programs have their own eligibility and enrollment rules. Confirm availability directly with the IRS and your utility before purchasing.
Timing depends on the site assessment, equipment availability, circuit route, permits, and inspection scheduling. Tell us your vehicle delivery date or other deadline when requesting the estimate. We confirm a schedule after reviewing the project rather than promising the same timeline for every home.
Your local installation team
From a garage beside the panel to a driveway that needs a longer circuit route, we plan the installation around the property. We confirm the local permit office from your service address.
Including Vienna, Reston, McLean, and surrounding communities.
Including Ashburn, Leesburg, Sterling, and nearby communities.
Charging plans for garages, driveways, and approved parking spaces.
Including Woodbridge, Gainesville, and the Manassas area.
Get a charging setup planned around your vehicle and your routine.